The paving surface of the fiberglass geogrid should be relatively smooth. After passing the pavement experience, in order to prevent longitudinal skew, first draw a white line or hanging line on the paving layer according to the width to start paving.
Fix the end of the grille with iron nails (8 nails per meter wide, fixed at a uniform distance), after fixing the end of the grille, use the paving machine to slowly pull the grille forward, each 10 meters long Perform manual tensioning and straightening once, until one roll of grid is paved, and then spread the next roll. The operation is the same as before.
After paving a roll, use a 6T-10T roller to roll from the starting point in the forward direction (If it is paved on the middle surface layer and the leveling layer, it is better to use a steel roller roller; if the grid is directly laid on the concrete pavement, it is better to use a rubber roller roller). Section length, after the section length of the grille should be covered, check the paving quality as a whole, and then lay the next section, when the next section is paved, the grille and the grille can be lapped by 10-15CM Length, and fixed with iron nails or wooden wedges, continue to lay the second section in the forward direction, and so on. The operation requirements are the same as before.